Container delayed

Our container was delayed leaving Montreal because apparently, the water levels are too low in the St-Lawrence river and the ship couldn’t take a full load.

It is now scheduled to arrive in the first week of December. However, we will still be opening our office in Gorgona in the third week of November.


Share This Post

Twitter Delicious Facebook Digg Stumbleupon Favorites More

2 Comments to “Container delayed”

  1. Hello,

    Terrific product! I will bring it to the attention of the architects with whom we are working. Does your price list include installation? If so, do you sell just the material?

    Best wishes,

    Douglas Bashaw ASTM

  2. administrator says:

    Thanks Douglas

    The prices do not include installation, which normally comes out to about 20% of the cost of material. We can work with your contractor to show them how to install it if there will be a large number of roofs to do. I see that you are in Boquete, we would definitely like to have trained installers out there.

    We normally prefer to install it ourselves to ensure it is done properly and eliminate any future problems, but training is not difficult.